DURATION
2 days
LEVEL
Basic
OBJECTIVES
Acquiring basic skills about installation and maintenance of air conditioning plants for ICT equipment. This course describes the cooling system components, with special attention to appropriate dimensioning and power saving.
PREREQUISITES
Physics principles.
WHO SHOULD ATTEND
Technical personnel involved in ICT air conditioning plants installation and operation & maintenance.
TOPICS
Cooling physics principles, psychometric, man health conditions, refrigeration cycle, cooler components
Machine efficiency: water-cooled refrigeration groups, autonomous direct expansion air conditioning, free-cooling and Heat Recovery
ICT system applications: requirements, direct expansion systems, water-cooled systems, data center air conditioning evolution, etc.
Power saving: appropriate dimensioning, maintenance systems
Noise pollution and vibrations
Troubleshooting